Roof and Deck Views

These pictures were taken June 14th.  The roof deck is taking shape including pads for HVAC equipment and brackets for the screens that will eventually shield equipment from view of third floor roof deck.

Arial View 130614 Roof from Lobby looking West 130614 Sanctuary Roof Fisheye NE view 130614 Third floor deck looking NE from SW corner 130614 Third floor deck looking SE from NW corner 130614

This is a view looking into the third floor lobby from the roof deck. Third floor lobby from roof deck

Kitchen and Pre-School Updates

Framing continues on the first floor western section.  The pictures below were taken June 14th

The kitchen is getting framed in as viewed from the narthex and then NE corner looking SW.

Kitchen from Narthex Kitchen takes shape 130614

Framing and HVAC continues for the two pre-school rooms in the hallway.

Pre-school hallway from Vestibule 130614 pres-school rooms 2 and 3 HVACpres-school rooms 2 and 3 HVAC looking SW

Outside the pre-school hallway the playground window and door frames are taking shape.

Pre-school playground and Pastors Offices

First Floor Framing in Western Section

In June framers began to work on the pre-school framing on the first floor of the western section and all areas of the second floor.

This is the large conference room overlooking N Fifth Street.

Conference room overlooking atrium

The quiet space at the top of the second floor landing overlooking Santa Clara Street. Framing Quiet space window

View from pre-school 1 and 2 looking west at the back stairs and community service room. Pre-school taking shape