9/11 Update

As we remember past events we look forward to the future in anticipation of our new Church.

The admin area has been painted.admin area paintedThe elevator car is complete. elevator car completedFraming the door on the elevator elevator door assemblyInternal signage on the second floor internal signageCabinetry installation in the pre-school. pre-school cabinetsRadiant heat boiler insstalled, waiting for power to test radiant heat boilerThe large classroom at the top of the stairs has been painted. second floor conference roomRepair to N 5th street is underway street repairThe north wall framed by Vintage Tower and City Hall stucco framed by vintage tower and city hallWestern conference room looking north. western conference room looking NWestern conference room looking south. western conference room looking S