First Elevator Ride

Here are a few September 6th pictures of the first ride in the elevator.

This is a view looking up taken between the first and second floor.View from Second floor going up

The hydraulics for our system includes a double piston to cover the entire range from first floor to third floor.three stop piston heavy duty piston

The ThyssenKrupp team first assembled the rails and installed the hydraulics.  They then built the base platform and tested out the hydraulics.ThyssenKrupp Elevator Install Team temporary controls

Next step will be to assemble the elevator car itself.  Once completed the elevator will be ready to go – except for small matter of programming which will be done closer to building occupancy time.Elevator - ThyssenKrupp Install Team