Framing Continues on Second Floor

These pictures were taken June 24th as framing continued on the second floor.

Admin area and doorways to pastors’ offices.

admin area 062413The large conference room above the community service room. NTBCC South view 130624Second floor quiet space with entry to data room shown on left second floor quiet space 130624The shower stalls were also added as they needed to be placed before the framing around them proceeded. showers 130624