More Digging and Moving

The process for preparing the site for foundations requires the “pad” of dirt under the foundation slab to be properly conditioned.  Most of the dirt that’s been dug up over last few days will be put back into the hole.  Some of the debris from the fire will be removed, and the large concrete chunks will be taken to a site with a large crusher to be recycled.

The parking lot as we knew it will be dropped about one foot.  Expect 50-60 loads of material to be off-sited.

The picture below was taken Sept 24th at 10am.

These next two pictures show the digging and subsequent moving of large cement chunks. First some digging:

Then, some moving: