9/11 Update

As we remember past events we look forward to the future in anticipation of our new Church.

The admin area has been painted.admin area paintedThe elevator car is complete. elevator car completedFraming the door on the elevator elevator door assemblyInternal signage on the second floor internal signageCabinetry installation in the pre-school. pre-school cabinetsRadiant heat boiler insstalled, waiting for power to test radiant heat boilerThe large classroom at the top of the stairs has been painted. second floor conference roomRepair to N 5th street is underway street repairThe north wall framed by Vintage Tower and City Hall stucco framed by vintage tower and city hallWestern conference room looking north. western conference room looking NWestern conference room looking south. western conference room looking S

Roof Deck and Stucco

Progress on the roof deck has been slowed by the permitting process.  Soon the insulation will be installed on the deck, re-bar added and the roof deck will be poured. Third floor deck 130906Above the roof deck progress on the base of the tower that will support the cross continues.base of tower

Progress on the stucco work on the north-facing walls continues.

stucco north walls - 1 stucco north walls - 2 stuco north walls - 3 stuco north walls - 4

 

First Elevator Ride

Here are a few September 6th pictures of the first ride in the elevator.

This is a view looking up taken between the first and second floor.View from Second floor going up

The hydraulics for our system includes a double piston to cover the entire range from first floor to third floor.three stop piston heavy duty piston

The ThyssenKrupp team first assembled the rails and installed the hydraulics.  They then built the base platform and tested out the hydraulics.ThyssenKrupp Elevator Install Team temporary controls

Next step will be to assemble the elevator car itself.  Once completed the elevator will be ready to go – except for small matter of programming which will be done closer to building occupancy time.Elevator - ThyssenKrupp Install Team

Sanctuary Lights and Carpet

These views from September 6th visit show the new carpet and pendant lights.

Work on the baseboards is nearly complete.sanctuary baseboard finishingMost interior doors on the first floor have been installed.  This is the handbell closet on the south west corner of the sanctuary. sanctuary carpet frames bell closetHere is a view of the south east corner leading to the “back of house” and emergency exit.sanctuarycarpetThis view looking north shows the pendant lights, downlights and continuing work on the baseboards.  The open double doors frame the entry to the multi-function room between the sanctuary and youth roomsanctuary view looking north 130905This last picture is taken from the north east corner looking toward the two vestibule exits which frame the tech booth in the middle.  The two doors on the right in the back are the electric room that supplies the sanctuary and the mechanical room containing the radiant heat system.sanctuary view looking SW 130906

Roof Deck Pour Soon

Permits for the pouring of the roof deck were issued and final preparations have been completed.  The final test prior to installation of re-bar and placing of the concrete were leak tests completed August 29th.

Following the repair of one small leak plans call for the concrete to be poured after insulation and re-bar have been installed.roof leak testwater testing roof terrace water testing suspicious joint

Internal Painting and Finishing Continues

Here are pictures taken August 23rd showing progress on all levels of the church.

Sanctuary viewed from tech booth. sanctuary from tech booth 130823 View of different finished on Sanctuary floor sanctuary floor reflections sanctuary floor options -1 sanctuary floor options -2Second floor western conference room with framing for stained glass at south end.

western conference room south walladmin area 130823Pre-school hallway and class rooms. preschool hallway 16 aug preschool -1  16 aug preschool -3  16 augOur color palletcolor palletAdditional views of inside spaces. western conference room north wall patio view from third floor entryway multi purpose room 130823 kitchen 130823 front hallway prepared for painting atrium panorama looking E 130823