Plumbing Complete

The plumbing for all downstairs drains has been completed, inspected and nearly filled in.  The next steps will be installation of the conduit for in-slab AV power and data in the sanctuary followed by gravel fill, re-bar reinforcement, installation of radiant heating pipes and finally pouring the slab for the first floor.

This first picture is a panorama taken from the end of the pre-school hallway looking out the front door toward City Hall.  On your left is the sanctuary, and slightly to the right notice the kitchen plumbing and downstairs bathrooms.  On your right is the view looking down the pre-school hallway out to N 5th St.  And further to your right is the view through the playground and back to the 5th street parking lot.Plumbing Panorama from Sanctuary Hallway

In the picture  below, taken from the entryway to the pre-school, you can see the kitchen drains, pre-school restroom drains and mens/womens restrooms on the first floor.kitchen and first floor plumbing

The next view shows the restroom drains in the pre-school room between sanctuary and youth room then on into the sanctuary.

Sanctuary from Youth Room

These two pictures show the large pile of pea-stone dwindling as the bobcat fills in the spaces around the drains.

Filling in the Drains rock pile getting smaller

One thought on “Plumbing Complete

Comments are closed.