Sheetrocking Leads to Ceilings

Sheetrock has been installed in a majority of the building now.  There is some touch up and a few areas are yet to be completed.  As sheetrocking is completed ceiling frames are installed so electrical and HVAC systems can be finished.

These pictures are of pre-school rooms.

ceiling tile in pre-school No2-rm 107 community service room sheetrocking pastors offices framing pre-school framing in room 106 pre-school room 107 from playgroundSheetrocking complex areas such as the entry way to the roof deck can be tricky.

sheetrocking third floor entrywayThe kitchen serving door is now installed.

Kitchen Serving Door

HVAC work continues in the Western conference room.NTBCC N with HVAC 130717